<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Paragon Design-Build</title>
	<atom:link href="http://paragondesignbuild.ca/feed/" rel="self" type="application/rss+xml" />
	<link>https://paragondesignbuild.ca</link>
	<description>Steel Buildings BC; Industrial-Commercial; Design-Build; General Construction</description>
	<lastBuildDate>Wed, 09 Mar 2016 19:14:36 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Orica Canada &#8211; Gibraltar Mine MMU Building</title>
		<link>https://paragondesignbuild.ca/orica-canada-gibraltar-mine-mmu-building/</link>
		<comments>https://paragondesignbuild.ca/orica-canada-gibraltar-mine-mmu-building/#comments</comments>
		<pubDate>Tue, 26 Jun 2012 13:37:57 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://paragondesignbuild.ca/?p=1572</guid>
		<description><![CDATA[The Orica Mining Services project, located at the Gibraltar Mine near Williams Lake, BC,  involved a new 6300 SF steel building with Maintenance Bays, Wash Bay and Offices/Personnel Areas.  Paragon's role included taking Orica's conceptual plans to a complete design-build solution, including strucutral, architectural and mechanical/controls design and engineering, to fit up the interior of the building with 3,000 SF of interior development, plus renovations to two existing buildings at the ...]]></description>
			<content:encoded><![CDATA[<span style="color: #000000;">The Orica Mining Services project, located at the Gibraltar Mine near Williams Lake, BC,  involved a new 6300 SF steel building with Maintenance Bays, Wash Bay and Offices/Personnel Areas.  Paragon's role included taking Orica's conceptual plans to a complete design-build solution, including strucutral, architectural and mechanical/controls design and engineering, to fit up the interior of the building with 3,000 SF of interior development, plus renovations to two existing buildings at the Orica facility.</span>

&nbsp;]]></content:encoded>
			<wfw:commentRss>https://paragondesignbuild.ca/orica-canada-gibraltar-mine-mmu-building/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Liquidity Wines &#8211; Innovative Solutions</title>
		<link>https://paragondesignbuild.ca/paragon-innovations/</link>
		<comments>https://paragondesignbuild.ca/paragon-innovations/#comments</comments>
		<pubDate>Thu, 22 Mar 2012 20:37:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[news]]></category>

		<guid isPermaLink="false">http://paragondesignbuild.ca/?p=1356</guid>
		<description><![CDATA[Liquidity Winery's new production building at Okanagan Falls, near Penticton, was completed in fall 2012 and includes 5,000 SF of new production areas.  There are a couple of "cool" elements to this project... the relatively complex structural assembly, (less than about 1% of pre-engineered steel buildings have hip roofs), and the horizontal insulated wall panels.  Those of you in the know will understand this is a pretty neat trick. Paragon collaborated ...]]></description>
			<content:encoded><![CDATA[<span style="color: #000000;">Liquidity Winery's new production building at Okanagan Falls, near Penticton, was completed in fall 2012 and includes 5,000 SF of new production areas.  There are a couple of "cool" elements to this project... the relatively complex structural assembly, (less than about 1% of pre-engineered steel buildings have hip roofs), and the horizontal insulated wall panels.  Those of you in the know will understand this is a pretty neat trick. Paragon collaborated during design and engineering, and then supplied and erected the custom steel building as well as provided concrete foundations and slabs.</span>

 <div class="divider"></div>

<div class="one-half"><p><a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/2012-09-14-16.03.49.jpg"><img class="alignnone  wp-image-1645" title="2012-09-14 16.03.49" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/2012-09-14-16.03.49-1024x768.jpg" alt="" width="304" height="184" /></a></p>
<p><a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Okanagan-Similkameen-D-20120801-00234.jpg"><img class="alignnone  wp-image-1639" title="Okanagan-Similkameen D-20120801-00234" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Okanagan-Similkameen-D-20120801-00234-1024x768.jpg" alt="" width="307" height="174" /></a></p>
<p> <a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/2012-07-26-16.35.21.jpg"><img title="2012-07-26 16.35.21" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/2012-07-26-16.35.21-1024x768.jpg" alt="" width="305" height="198" /></a></p>
</div>

<div class="one-half last"><p> <a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Okanagan-Similkameen-D-20120801-00238.jpg"><img title="Okanagan-Similkameen D-20120801-00238" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Okanagan-Similkameen-D-20120801-00238-1024x768.jpg" alt="" width="307" height="182" /></a></p>
<p><a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Loquidity-Hip-Roof.jpg"><img title="Loquidity Hip Roof" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Loquidity-Hip-Roof-1024x768.jpg" alt="" width="309" height="170" /></a></p>
<p><a href="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Liquidity2012-001.jpeg"><img class="alignnone  wp-image-1656" title="Liquidity2012-001" src="http://paragondesignbuild.ca/wp-content/uploads/2012/03/Liquidity2012-001.jpeg" alt="" width="308" height="201" /></a></p>
</div><div class="divider"></div>

<span style="color: #000000;">Special thanks to Wally James of Buccaneer Contracting, prime contractor / construction manager for the project.  Wally worked with Liquidity's owners as both designer and general contractor, with oversight for the complete project, based on Wally's many years of experience and success in building wine facilities - among other things. (Have a look at <a href="http://www.buccaneercontracting.com"><span style="color: #000000;">www.buccaneercontracting.com</span></a>). </span>

&nbsp;]]></content:encoded>
			<wfw:commentRss>https://paragondesignbuild.ca/paragon-innovations/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>
